While the property is currently unoccupied, my son will be moving out of his apartment and into the house the first of February about a week after we close. That does not give us much time to remodel before he moves in. So we are going to have to do the majority of the repairs and upgrades while my son lives in the house. Prior to his moving in I hope to have the bathroom and kitchen functional and the bedroom done. There is a lot of work that needs to be done. We (My Son and I) will be burning a lot of midnight oil to get this done before he moves in.
Punch List
Kitchen - Looks like we will have to live with the Shag Carpet for awhile, but we will definitely need a working refrigerator. Clean Cabinets and replace missing knobs. Repair Broken drawer and Light above the sink. Repair electrical outlet above counter. Clean Oven.
Bedroom - Install Door, Ceiling Light, Walls Painted, Carpet Replaced.
Bathroom - Medicine Cabinet Replaced, Lights and Light switch added, Shower Curtain and Rod, Carpet Replaced. Tub/Shower Wall and ceiling Laminate Clean and painted. Window cleaned/sealed/painted. Shower Head.
Oh and lets not forget the concrete step that needs repaired.
No comments:
Post a Comment